WHAT IT TAKES
How did we make the SALURAN initiative happen and make it a reality right here in the State of Sarawak.
Step 1 | Identification of Areas to be Covered

Rural Settlement

Urban Settlement

Road Highway

Tourist Attraction

Industrial Areas
Step 2 | Factors to Be Considered in Choosing The Right Technology





Step 3 | Infrastructure Requirements


Step 4 | Choice of Radio Frequency to be Assigned

Note: Radio Frequency Assignment is under MCMC

Step 6 | Site Identification and Land Acquisition

Weather Condition

Unsuitable Mountainous Locations

Manual labour required to build the tower

Logistics and Accessibility issues
Construction and installation phase (Average Time Taken: 12 Months)
Step 7 | Service and Customer Management






Step 8 | Operational Challenges
Theft
Vandalism
Costly
Power instability
Remoteness
Step 9 | Compliances


As a consumer, I need to know:
- Am I within the coverage of the nearest tower?
- Is this mobile or home broadband
- How much do I have to pay?
- Is there a limit to how much data I can use?
- How fast is the internet?